KSE installed 1,000LF  of 10″, 8″ & 4″ VCP Sewer. 1,200LF 18″ RCP Storm Drain, 2,500LF of 10″, 8″, 6″ & 4″ PVC Storm Drain. 6 Storm Drain and 5 Sewer Man Holes. 2,000LF of 8″ & 4″ C900 Waterline.

Prime/GC: S.J. Amoroso
Client: Army Corp of Engineers/Dept. of Veterans Affairs
Location: Long Beach, CA

Type

Share this Project